Service manual
B
A
C D E F G SERVICE
16
C
Installing the Electricity and Gas to the Appliance
C1 Power Supply
While the cavity is being created
consideration should be given to
appropriate location of a standard 3 pin,
EARTHED 230/240V power outlet. This
must be within 1.0m of the bottom right
of the appliance.
IMPORTANT: Locating the power outlet within the cavity makes the installation very neat
but provision MUST be made to be able to switch the power supply o and on (electri-
cal isolation switch) and MUST be accessible after the heater has been installed. This is
normally done by means of a separate switch located outside of the cavity and wired to
the plug. This will allow technicians to isolate the power supply before servicing the ap-
pliance.
This appliance must not be located immediately below a socket outlet.
This appliance will draw a maximum of 2 Amps from a 230/240V supply.
No additional power supply is required for the power ue.
C2 Network Cable
A 5 meter length of network (Ethernet) cable has been supplied and is coiled inside the
lower right of the replace. Access this via the removable access panel, and connect it to
the buildings modem.
If you do not wish to connect the replace to the modem, the Network /
Ethernet cable should be run to somewhere accessible by a service
technician, such as a cupboard.
1m










