Service manual

B
A C D E F G SERVICE
28
E13 Crystalight and Driftwood Fuel Bed Installation
As per E12, and then once Crystalight has been evenly spread across the base of the
rebox place the supplied driftwood on top of the Crystalight as shown:
DL850
DL1100
5
15
24
11 19
29
13
5
30
13
13
30
30
29
24
24
11
11
19
19
15
15
29
5
5
5
5
E14 Checking the Operating Pressure
WARNING: The regulator that is supplied with the re MUST NOT BE REMOVED. Removal
of the regulator, or replacing it with one not intended for use with an Escea re, will void
the limited appliance warranty.
Check the operating pressure at the regulator located at the front RH corner of the appli-
ance. This is best done before the fascia panels have been tted to avoid fascia damage. A
pressure test point is available for the operating test pressure (as shown below).
Maxitrol
Beckley
A
B
C
A
D
C
A = Operating Pressure test point
B = Pressure adjustment screw (To access rst remove metal cap)
C = Inlet gas connection ( ½” Female BSPT)
Check the inlet pressure to the appliance. Attach manometer tube to the rst test
point upstream of the appliance (typically at the gas utility meter or auto change device
for a propane bottle station)