User manual

5 INSTALLATION
0463 373 101
- 41 -
© ESAB AB 2015
1. Control cable plug 4. Connection to FLC-2 or KSC-2
(by-passing the switch)
2. Control cable 5. Power source / robot control with nozzle
sense function
3. EURO central connector