User manual

5 INSTALLATION
0463 373 101
- 20 -
© ESAB AB 2015
5.3.1 Torch mount in standard RT system
5.3.1.1 Direct mounting of KS-2
1. If necessary, carefully press the cylindrical pins (1) into the corresponding holes in the
bracket. Avoid the formation of burrs. The pins should protrude by approximately 5 mm
(0.2 inch).
2. Position the mount on the safety-off mechanism KS-2 and carefully insert the cylindrical
pins (1) into the holes provided. In doing so, take the later position of the torch into
account. Two mounting positions may be potentially possible.
3. Then screw down the mount evenly using the enclosed cylinder screws with hexagon
socket (2).
NOTE!
The maximum tightening torque for the cylinder screw (2) is 6 Nm (53 lbf in)
and the property class category is 8.8.
Side view
1. Cylindrical pins Ø4×20
2. Cylinder screw with hexagon socket M6
DIN 912 (length of the screw depending
on the torch mount)
5.3.1.2 Mounting via mounting flange
Torch mounts with a central clamping assembly can only be fastened on the journal of the
mounting flange. For this, the mounting flange must be fastened first.
1. If applicable, carefully press the cylindrical pins (1) into the corresponding holes in the
mounting flange. Avoid the formation of burrs. The pins should protrude by
approximately 5 mm (0.2”).
2. Position the mount on the safety-off mechanism KS-2 and carefully insert the cylindrical
pins (1) into the holes provided. In doing so, take the later position of the torch into
account. Two mounting positions may be potentially possible.
3. Then screw down the mounting flange evenly using the enclosed cylinder screws with
hexagon socket (2).
NOTE!
The maximum tightening torque for the cylinder screw (2) is 7.1 Nm (62.8 lbf
in) and the property class category is 8.8.
4. Unscrew the axial cylinder screw with hexagon socket (4) out of the mounting flange
together with the washer (3).