Poolroom SHOWER DOOR Shower Door Installation Instructions Please do not return the product to the store. | Contact us with any questions.
Grog SHOWER DOOR Model Specific Preparation A REQUIRED: Verify threshold and wall with a level. 1/4” (6mm ) Out-of-Plumb Adjustment within the Wall Profile. CY Threshold must be level.
Poolroom SHOWER DOOR PACKAGE CONTENT B A PACKAGE CONTENT . PART# DESCRIPTION QTY = = A Bottom threshold cap (R)| 1 PART# DESCRIPTION QTY B Bottom Rail 1 H PVC seal 4 C1 Inside Door panel 1 Upper guide rail lock Outside Door panel 1 J Upper guide rail lock Bottom threshold cap (L)| 1 K Roller set (L) 2 E Wall Jamb 2 L Roller set (R) 2 F Knob A 1 M Upper Guide Rail 1 G Knob B 1 N Towel Bar 1 wore Inspect all parts for missing prior to installation! ~ A Contact us for any part missing.
Poolroom SHOWER DOOR PACKAGE CONTENT Metric Screw Wall anchor Screw cap ST4X30mm @6x28mm M5X12mm 7 pcs 7 pcs 7 pcs 9 pcs ee ff Washer Plastic tube 10XP5X1.0 Additional spare parts are included. 9 pcs 9 pcs ore Inspect all parts for missing prior to installation! A Contact us for any part missing.
Grog SHOWER DOOR TOOLS REQUIRED Drill Bits Screw Driver Drill Level Mg . 5 21/4°& @5/16" (6&8mm) dia OO rd HSS Silicone Measuring Tape Soft Head Pencil Knife Sealant MASONRY DRILL| ( Safety Glasses BIT FOR TILE @6mm \ J Glove Carpenter's Squarer| | Masking or painter's Hack Saw tape TTB Metal File Glass suction 4 Website: Hotlink : + 1 302 336 8180
Poolroom SHOWER DOOR SAFETY INFORMATION CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: * Always wear safety glasses and gloves while handling. + Always follow the installation instructions. * Inspect glass for damage before installation.
Poolroom SHOWER DOOR Measure the finished opening width. — 1.Measure the finished opening width at the bottom and at the model height. NOTE Use these dimensions as “W1” (top) and in step #2. 2.Also check the threshold for level and the walls for 1) This model will only accommodate up to 1/4" (6mm) for out-of-plump condition.
Poolroom SHOWER DOOR Cut the Upper Guide Rail (M) and the Bottom Rail (B) to fit your finished opening using either a miter saw or a hacksaw Cut the Upper Guide Rail (M) to: “W1” (top) dimension 1/16" A a Upper Guide Rail Vis. A N i Cut the Bottom Rail (B) to: dimension 9/16" Use a metal file to remove any burrs from the cut ends.
Poolroom SHOWER DOOR Bottom Rail(B) Installation 1.Apply silicone into the groove along the entire length of the Bottom Rail(B) as Fig a; 2 Measure in 5/16" from the outside of the Bottom Rail(B) as Fig.b. Fig.a Fig.b 8mm Use Painter’s Tape to hold the Water seal tight in position while the silicone cures.
Poolroom SHOWER DOOR Wall Jamb(E) Installation 1.Attach the Cap(A & D) to Wall Jamb(E) as Fig.a; 2 Attach the Wall Jamb(E) to Bottom Rail(B) as Fig.b; , | 3.Please note one end with 2 side holes faces up.Mark the location of the holes as NOTE | Fig.c; “| 4.Drill the holes as Fig.d and Fig.e; 5.Apply silicone into the groove along the entire length of the Wall Jamb(E) as Fig f; 6.Attach the Wall Jamb(E) to the wall as Fig g. Fig.a Fig.b Jr g Toe Fig.
Grog The green label faces outside. Website: YON SHOWER DOOR ~ The faces inside. Outside Inside " TOTE Ny The Installation on the Inside Door Panel (C1) 1. Insert the Plastic Tube(ff) in to Door Panel (C1); 2. Use Screws (dd) and Washer) attach the Roller Set (K&L) .
Poolroom SHOWER DOOR Upper Guide Rail (M) Installation a ea Inside Glass Paneling) inside the shower NOTE place before install the Upper Guide Rail(M), ha on the green label faces outside. The green label faces outside; The Roller faces inside. Insert the Upper Guide Rail(M) into the installed Wall Jamb(E). Green Label | mmm mmm Check the Upper Guide , | Rail for level.
Poolroom SHOWER DOOR The Installation on the Outside Door Panel (C2) | The faces Outside. NOTE Outside 4 pr Inside =I 1. Insert the Plastic Tube(ff) in to Door Panel (C2); 2. Use the Screws (dd) and Washer) attach the Roller Set (K&L) . The green label | NON oe ~ faces outside. / oo LL ITI TTL + 4 holes on the top! X1 Rollers tr “Website: exbriteusa.
Grog CEE REE mmm EEE mmm The green label | 7 faces outside. X1 SHOWER DOOR Outside Door paneling) Installation Fig.a Fig.b Inside Fig.c Inside Outside Figs |” \ Fig.e Raise Roller Wheel to lower Door panel Lower Roller Wheel to raise Door panel ©) 1. Move the bottom guide slider of the Bottom Rail(B) to the side as Fig.a; 2.Insert the Outside Door Paneling) into the Upper Guide Rail(M) as Fig.b and Fig.c . DO NOT install the towel bars on the glass until instructed.
Poolroom SHOWER DOOR Inside Door paneling) Installation Fig.b Outside The green label — faces outside. x Inside Outside Fig d % Fife Move the bottom guide slider to the aide roller ee wore roller lower Door panel to raise Door panel middle as Fig.a; — TT 2 Insert the Inside Door Panel into the 3 3 Upper Guide Rail(M) as Fig.b and Fig.c; OS ©) DO NOT install the towel bars on the glass until instructed. I DO NOT lift the glass using the towel bars; 1.
Poolroom SHOWER DOOR Knob A (F) . Knob B(G) and Towel Bar (N) Installation Attach the Knob A (F) &Knob B(G) to B the Inside Door Paneling) and Attach note | the Towel Bar (N) to the Outside Door Paneling) . Be sure to use all of the supplied rubber gaskets to protect the glass.
Poolroom SHOWER DOOR Attach the PVC Seal(H) to Door NOTE, | 2 pieces on each door. | 1.Attach the PVC Seal(H) to Door 2.
Poolroom SHOWER DOOR Attach the Lock(l & J) to Upper guide rail(M) . Put one lock into the track of the Upper Guide rail(M) , and then move the lock to the side until the tab of the lock goes inside the hole of the Wall Jamb(E). Repeat this installation to install all 4 locks as Fig. a N OTE, Fig.
Poolroom SHOWER DOOR SEALING NOTE | The surfaces need to be clean and free of debris before applying silicone. | Ensure that the Shower door closes tightly and opens smoothly. Apply a good quality silicone sealant along the wall Jamb(E) and NOTE) h Bottom Rail(B) . A | Allow 24 hours for the silicone to cure before using the shower. | x) supplied). Apply Silicone Sw a Apply silicone around the bottom rail. Use Painter’s Tape to hold the Water seal tight in position while the silicone cures.