Installation Guide

8. All information in these instructions is based on the latest product information
available at the time of publication. Eridanus reserves the right to make revisions to
the design of products without notice.
9. Use proper securing hardware and techniques to ensure the support frame will
bear a minimum of 300 lbs (136 kg).
10. Due to differing demands and purposes for usage possible, a template will not
be provided for this model.
Installation Procedures
H=Top of Cabinet to Top Doors
H
STEP I. Base Cabinet Preparation
Measure the actual size of the sink;
make sure the distance from the top of
the cabinet to the top of the cabinet
doors(dimension H) is greater than the
apron height.
NOTE The cabinet opening should
equal the maximum sink dimensions to
ensure a minimum gap between the sink
and the cabinet.
Apply painter’s tape to the cabinet to
mark cuts and to protect the cabinet
surfaces from any potential damage
when cutting.
Cut the cabinet along the traced lines to
create an opening that will allow the sink
to slide in.
NOTE It's highly suggested the cabinet
be cut after receiving the actual sink. If
the sink is not available at the time of
cabinet preparation, make allowances
to add cabinet filler strips to the opening
after the frame and before the sink is
installed.
Outline for Apron Front
Sink Cutout
Apron
03
Installation Guide