User's Manual Part 1

RBS 2308 and RBS 2309 User’s Guide
Installation pers
onnel are responsible for the following activities:
Installing the antenna system
Installing the RBS
Earthing the RBS
Connecting a power supply to the RBS
Connecting the antenna system to the RBS
Installing cable ladders and cable ducts
Installing battery backup
Installing transmission cables
The test and integration personnel are responsible for the following activities:
Performing the tests specified in the contract and integrating the site
Commissioning of the PSTU
Troubleshooting if tests indicate a fault
Recording the test results in the Site Installation Documentation, which is
returned to the engineering personnel
1.5 RBS Library Overview
For information on the RBS library and other manuals related to the RBS, see:
RBS 2000 Library Overview
LZN 302 73
1.6 Release History
In addition to editorial changes, such as correction of typographical and layout
errors, this manual has been revised as follows:
1.6.1 R7B to R8A
General
Information about the PSTU and IP-based transmission has been added
8
EN/LZT 720 0027 Uen R8A 2006-06-27