User's Manual Part 3
RBS 2109 User’s Guide
6. If RBS site integration is not performed immediately after site installation
tests, then close the sunshields.
7.9.3 Completing Test Record
This section contains a test record. It is recommended to fill in the test record
during the testing procedure.
1
40
E
N/LZT 720 0090 Uen R1A 2004-09-17