User's Manual Part 3
RBS 2109 User’s Guide
8.4.3 Filling in the Checklist
This section describes the checklist to be filled in after the integration has
been completed.
The following checklist is not mandatory but it is strongly recommended. Local
procedures and safety regulations must be evaluated and included in this
checklist.
Table 49 Checklist
Check the following: OK
1.
The indicators on the RRU and the IXU are in the approved status.
2.
The test equipment has been disconnected from the RBS.
3.
The RBS cabinet and the mounting base are free from foreign
objects.
4.
All cables are free of damage.
5.
Top and bottom of cabinet are free of obstructions (for airflow).
6.
The cabinet has been locked, and the screws have been
tightened.
7.
All tools have been accounted for.
8.
All paperwork has been completed.
8.4.4 Network Element Acceptance Certificate
This section contains a Network Element Acceptance Certificate to be filled in
by the person responsible. See Figure below.
1
54
E
N/LZT 720 0090 Uen R1A 2004-09-17