User's Manual Part 3
RBS 2109 User’s Guide
The RBS now downloads and executes the commands previously prepared
by the BSC operator. When the Local indicator turns off, the RBS is in
remote mode.
5. Check that all RRUs are in Remote Mode by confirming that the Local
indicator on each RRU is off.
6. If BTS PCM Supervision is used, then wait for the BSC operator to activate
it and check that MO DP state is operational.
7. Wait for the BSC operator to activate and check the cell.
8.3 Making Test Calls on the Air Interface
This section describes how to make test calls on the air interface. The tests are
performed from the RBS site to verify that all TSs on all TRXs work properly.
The test calls are performed by using a Test Mobile Station (TEMS). See TEMS
Investigation GSM Manual in the TEMS Kit.
Note: It is important to test all TCH-TSs to ensure full capacity.
All the test calls should be made from a distance of at least 50 m (164 ft) from
the antenna system. See Figure below.
P007015A
Min 50 m
TEMS
Figure 70 Test Call Using TEMS
147EN/LZT 720 0090 Uen R1A 2004-09-17