7 Site Installation Tests
This section describes the test procedure for site installation tests.
7.1 Preconditions
Before starting the tests, ensure the following:
A completed test record for Antenna System Tests is available
The nominal AC mains voltage and/or DC supply on the site is known
Note: The information above can be found in:
Site Installation Documentation
A test record is available
Chapter Safety Instructions has been read
7.1.1 Documentation
The list below displays the manual required for site installation tests.
Table 21 Required Manual for Site Installation Tests
Product Name Description Product Number
OMT User’s Manual Included in OMT Kit EN/LZN 720 0001
7.1.2 Before Starting Test Procedure
Before starting the test procedure, ensure the following:
All personal rings, wrist watches, and other metallic objects are removed
before working with the power system
The necessary tools, instruments, and documentation are available
7.1.3 Work Process for Site Installation Tests
This section describes the order in which to perform the tests. When the exit
criteria are fulfilled, the tester should enter the results in the test record, and
return to the work process for the next step in the process.
101EN/LZT 720 0090 Uen R1A 2004-09-17