RBS 2109 User’s Guide
5.4.16.2 Performing Final Checks
Before leaving the site, make sure that the following tasks have been completed:
Table 12 Checklist
Check the following: OK
1
All cables are properly routed and connected.
2
All sunshields are properly installed.
3
The site is clear of waste materials.
4
The Site Installation Documentation is updated.
5
The modified Site Installation Documentation has been
handed over to the person responsible for the site.
6
The RBS is powered up if the surrounding temperature
changes between hot and cold and the RBS installation is not
completed within 48 hours.
(1)
(1) See Chapter Site Installation Tests.
7
2
E