User Manual
Table Of Contents
- toc
- 1 Introduction
- 2 Product Overview
- 3 Dimensions
- Weight
- Colour
- 4 Space Requirements
- Space above the RBS Cabinet
- Layout for RBS Cabinets
- Earthquake Requirements
- Footprint
- 5 Environment
- 6 Hardware Units
- 6.1 RBS 2206 Standard Hardware Units
- ACCU-01
- CDU
- CXU-10
- DCCU-01
- dTRU
- DXU-21
- FCU
- IDM-01
- PSU
- DC Filter-01
- 6.2 RBS 2206 V2 Standard Hardware Units
- ACCU-11
- CDU
- CXU-10
- DCCU-11
- DCCU-13
- dTRU
- DXU-23
- IDM-11
- PSU
- 6.3 Optional Hardware Units
- ASU-01
- Bias Injector
- BBS
- ddTMA
- DXX
- DF
- ESB
- HCU
- 19-inch Space for Optional Equipment
- OXU
- Splitter
- TMA-CM-01
- TMA-CM-02
- 7 Interfaces
- 8 Power System
- 9 Transmission
- Overvoltage Protection Modules
- Optional Transmission Equipment
- 10 External Alarms
- 11 Standards, Regulations and Dependability
Environment
Footprint
Unit of measurement: mm
P008315A
(RBS 2202)
RBS 2206
FRONT
99
400
598
220
45
320
400
o 20x75
Figure 3 Drilling Pattern
The RBS 2206 has the same footprint as the RBS 2202 cabinet. The base
frame is used as a template to mark new holes. If an RBS 2202 is being
replaced by an RBS 2206, the holes for the old cabinet can be used for the
new cabinet.
The RBS 2206 V2 uses the same base frame as the RBS 2206.
5 Environment
The RBS is designed to operate within limits stated for climatic requirements
and also to have a limited effect on the environment.
5.1 Operating Environment
The climatic requirements for the RBS on the site are shown in the table below.
7
19/1551-LZA 701 0001 Uen PG1 | 2010-10-08