User's Manual

Ericsson Internal
INSTALLATION INSTR. 5 ( 37 )
/ XKUEMHU 50/1531-LZA 701 0001 Uen
CBC/ XRX ( Jan-Erik Thillberg) 2009-03-09 C
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
Target Group
The target group for this instruction is personnel involved in the installation
of an RRU-N.
3.1 Prerequisites
This section describes the prerequisites for installation.
Preconditions
Before starting site work, ensure the following conditions have been fulfilled:
Site access permission received.
Ordered RRU-N, equipment, specified tools and other necessary facilities
have been delivered.
Site power is available.
Site grounding point is available.
Note: The terms earthing and grounding are synonymous.
Antenna system installed.
During outdoor installation, protection for the RBS is available in case
of bad weather.
Note: If the surrounding temperature changes between hot and cold after
installation, to avoid humidity damage, the RRU-N must not be left
without power for more than 48 hours.
Equipment
The instructions in this document describe the installation, or use, of the
following:
RRU-N
Front Sunshield
Mounting fixtures for mast and pole mounting (alternative)
Brackets for wall mounting (alternative)
Drilling template for wall mounting (when wall mounting alternative is used)
Grounding kit
Power cable
Jumper cables