User's Manual

Ericsson Internal
INSTRUCTIONS 6 ( 14 )
/ XSNBRKI 4/1532-LZA 701 0001 Uen
EAB/ FJG/RSP ( Louise Cederlund) 2008-05-14 G
Prepared (also subject responsible if other) No.
Approved Checked Date Rev Reference
4 Switching On the RBS
This section describes how to switch on the RBS.
1. Switch on the RBS main power. The switch for the RBS main power is
located outside the cabinet
2. Switch on all applicable circuit breakers on the IDM.
3. Switch on the battery fuse switch, located outside the cabinet. This is
applicable only if the RBS is configured with a battery backup system.
4. If the RBS is not supplied with software, download the software from the
OMT. Follow the instructions given in the document RBS SW Update,
using the alternative “The IDB on flash card is kept”.
5. Wait until all units are powered up before continuing testing of the site
installation.
Note: When the Operational indicator is double-flashing on a
Replaceable Unit (RU), it means that the RU is performing a
function change and saving software in internal flash memory.
Do not disturb any RU or change any RU to local mode while
an RU is indicating a function change. RUs continue to indicate
function changes until a function change restart takes place.
For further information, see document Optical Indicators and
Switches.
Note: If the indicator on the DXU is flashing, software need to be loaded.
Follow the instructions given in the document RBS SW Update,
using the alternative ”New IDB created, using the OMT, is to be
used” or “The IDB on flash card is kept”.
Note: It can take up to 10 minutes before all units in the cabinet are in
operation.