8.5 Filling in the Checklist
The following checklist is not compulsory but is strongly recommended. Local
procedures and safety regulations must be evaluated and included in this
checklist.
Table 7 Site Installation Verification Checklist
Check That:
Yes
1.
All fault indicators are off
2.
The Local indicator on the DXU is off (or flashing if no PCM link
is connected)
3.
All other indicators on the DXU are off
4.
The Local indicators on all DRUs are off (or flashing if no PCM
link is connected)
5.
The TX not enabled indicators on all DRUs are on
6.
All other indicators on all DRUs are off
7.
All other green operational indicators are on
8.
All other yellow indicators are off
9.
The test equipment has been disconnected from the RBS
10.
The cabinet is dry inside
11.
The inside and outside of the cabinet are undamaged
12.
All cables are undamaged
13.
A backup copy of the IDB has been saved
14.
All tools have been accounted for
15.
The cabinet door is locked, if applicable
16.
The external air intake is free of obstructions
17.
All paperwork has been completed