Installation Instruction
Table Of Contents
- toc
- tables
RBS Installation Instructions
Check the following: OK
5.
The modified Site Installation Documentation has been handed
over to the person responsible for the site.
6.
The RBS is powered up if the surrounding temperature
changes between hot and cold and the RBS installation is not
completed within 48 hours.
(1)
(1) See document Verifying RBS Installations at Site
.
12 41/1531-LZA 701 0001 Uen D 2008-04-23