Installation Instruction
Manuals
Brands
Ericsson Communications Manuals
Electronics
PCS 1900 picocellular basestation
7
8
9
10
11
12
13
14
15
16
Table Of Contents
toc
1 Introduction
Target Group
1.1 Revision Information
2 Preconditions
Documentation
General Preconditions
Additional Preconditions for Wall or Ceiling Mounted RBS
3 Tools and Instruments
3.1 Tools for Installation
4 Installation Procedure
Figure 1 Installation Flowchart
4.1 Unpacking RBS
4.2 Installing the RBS
4.2.1 Installing the Wall Plate
4.2.2 Installing the Wall Plate on a Ceiling Bracket (Optional)
4.3 Attaching the RBS
4.4 Installing DC power
4.5 Connecting Cables
4.6 Replacing Front Cover
4.7 Testing the Installation
4.8 Performing Concluding Routines
4.8.1 Updating the Site Installation Documentation
4.8.2 Performing Final Checks
tables
Table 1 Basic Tools for Installation
Table 2 Objects to Be Recycled or Disposed of After RBS Installa
Table 3 Checklist
Installation
Procedure
3.
Attach
the
RBS
in
its
position
and
press
it
down.
Make
sure
the
hole
on
the
bracket
and
the
hole
on
the
RBS
are
aligned
(see
2
in
figure
to
right).
7
41/1531-LZA
701
0001
Uen
D
2008-04-23
1
...
...
9
10
11
12
13
...
...
16