User's Manual
Table Of Contents
- toc
- 1 Introduction
- 2 Tools and Documentation
- 3 Installation RRU-N
- Introduction
- Target Group
- 3.1 Preconditions
- 3.2 Installation Procedure
- Figure 1 Workflow for Installing the RRU-N
- 3.2.1 Unpacking and Checking the Material
- 3.2.2 Installing RRU-N on a Pole or a Mast
- 3.2.3 Installing RRU-N on a Wall
- 3.2.4 Grounding RRU-N
- 3.2.5 Connecting the 48 V DC Power
- 3.2.6 Connecting Optical Fiber Cable and Setting RRU-N Configura
- 3.2.7 Connecting Antenna Cables
- 3.2.8 Installing the Front Sunshield
- 4 Optional Installation External Splitter/Highway Function
- 5 Optional Installation External Hybrid Combining Unit (EHCU)
- 6 Performing Concluding Routines
- 7 Verifying the Installation
- tables
RBS Installation Instructions
Product Name Description Product Number
Torque set, 0.5 – 4 Nm
for bits
LTT 601 145/1
Torque Set, 5 – 25 Nm LTT 601 140/1
Torque Set,
20 – 100 Nm
LTT 601 141/1
Other tools needed
Open-ended torque
head (U-key) 16 mm
LSB 107 12/6
2.2 Documentation
The following documentation is referenced in this document.
Ensure that the following documents are read and understood:
• Personal Health and Safety Information, 124 46–2885
• System Safety Information, 124 46–2886
Ensure that the following documents are available:
• Site Installation Documentation, specific for the site
• Standard Tools and Equipment Catalogue, EN/LZT 720 0013
• Standard Site Material Installation Instructions, EN/LZT 720 0014
• Site Installation Verification, 4/1532–LZA 701 0001
• RBS Product Description, 198/1551-LZA 701 0001
• Verifying Antenna Systems, 1/1532-LZA 701 0001
• Installing Hardware for TG Synchronization, 42/1531-LZA 701 0001
• Installation Instruction, 51/1531-LZA 701 0001
3 Installation RRU-N
Introduction
This chapter describes how to install the RRU-N.
2
50/1531-LZA 701 0001 Uen PA4 2008-07-31