User's Manual

Verifying the Installation
Check the following: OK
3.
The site is clear of waste materials.
4.
The Site Installation Documentation is updated.
5.
The modified Site Installation Documentation has been
handed over to the person responsible for the site.
6.
The RBS is powered up if the surrounding temperature
changes between hot and cold and the RBS installation is
not completed within 48 hours.
7 Verifying the Installation
To verify the RBS installation, follow the instructions in the document Site
Installation Verification.
29
50/1531-LZA 701 0001 Uen PA4 2008-07-31