Operation Manual
Scheduling Projector Events
21
a
• To edit the event schedule, select the event in the Schedule Settings
screen and select Edit.
• To remove a scheduled event, select the event in the Schedule
Settings screen and select Delete.
• To enable or disable the scheduled event without removing the
scheduled event from the list, select the event in the Schedule
Settings screen and select Enable/Disable.
• To enable or disable all scheduled events, select Tool from the menu
bar, select Schedule, and then select Enable Schedule/Disable
Schedule.
gg Related Links
• "Projector Properties - Schedule" p.38










