Quick Reference Guide

PSB No: P-0102
Page: 2 of 2
6.
Clean the plate and the end of the CGS. Lube the assembly with light
machine oil (Epson 02 oil).
7.
Do the same for the right side by first removing the carrage motor.
Figure 1
8.
Remove the E ring and spring that attaches the “Guide shaft holding lever” or
clutch plate.
9.
Mark the parallelism adjustment plate and remove the two screws that attach it.
10. Clean the plates and the end of the CGS. Lube the assembly with light machine oil
11. Assemble in reverse order, do the PGM backlash adjustment, check and perform
the parallelism adjustment if necessary and test.