Operation Manual

132
User’s Guide
List of ESC/VP21 Commands
Command List
When a power on command is sent to the projector, the power will turn on
and the projector will change to warm-up mode. When the power has
turned on, a colon ":" (3Ah) will be returned.
When the projector executes a command, it returns a ":" and waits for the
next command to be sent.
If command processing terminates with an error, the projector outputs an
error message and then returns the ":" code.
* When issuing any of the above commands, tack a Carriage Return (CR)
code (0Dh) on to the end.
Communication Protocol
Cable Layouts
Item Command
Power ON/OFF
ON PWR ON
OFF PWR OFF
Signal Selection
Computer1/Component SOURCE 10
Computer2/Component SOURCE 20
Video SOURCE 41
S-Video SOURCE 42
EasyMP (EMP-835 only) SOURCE 50
A/V Mute ON/OFF
ON MUTE ON
OFF MUTE OFF
A/V Mute Selection
Black MSEL 00
Blue MSEL 01
User's Logo MSEL 02
Standard baud rate : 9600 bps
Data length : 8 bits
Parity : None
Stop bit : 1 bit
Flow control : None
Connector shape : D-Sub 9-pin (male)
Projector input port : Control (RS-232C)
Serial Connection
Connector shape : D-Sub 9-pin (male)
Projector input connector : Control (RS-232C)
<
At
compu
t
er>
<At projector> (PC serial cable) <At computer>
Signal Function
GND 5 5 GND
GND Signal wire earth
RD 2 3 TD
TD Transmit data
TD 3 2 RD
RD Receive data
DTR 4 6 DSR
DSR Data set ready
DSR 6 4 DTR
DTR Data terminal ready
<
At
pro
j
ec
t
or>