Service manual
4-35
CONFIDENTIAL
EMP-1825/EMP-1815/EMP-1810
SEIKO EPSON Revision:C
C A U T I O N
ī (EMP-1815/1825 only) After the CF Shading Sheet is installed as shown
below, attach the Gasket (x2) to the circled places through the holes.
Figure 4-39.
ī (EMP-1815/1825 only) Attach the USB Shading Sheet; B and the LAN
Shading Sheet as shown below aligning on the IM Boardās surface. Attach the
Gaskets as shown in the figure below.
Figure 4-40.
ī (EMP-1815/1825 only) Before installing the IM Shield Plate, attach the BS
Sheet FIF, IM Shading Sheet, Connector Shading Sheet according to the red-
lined standard as shown in the figure below.
Figure 4-41.
CF Shading Sheet
Gasket 5x5 (L=10)
USB Shading Sheet; B
LAN Shading Sheet
Gasket 5x5 (L=10)
Gasket 10 x10 (L=10)
IM Shading Sheet
Connector Shading Sheet
BS Sheet FIF










