Installation manual
• Equipment Needed :
– 1/2” and 1 1/4” hole punch and rubber grommets.
– Power drill with bits. CAUTION! Do not use electric drill around LPG.
– Assorted bolts and nuts for mounting to truck cab floor - length determined by the thickness of
the cab floor.
– Digital Voltmeter.
– Pliers
–
Screwdrivers
Equipment Needed
–
Screwdrivers
– Socket and Allen wrenches
– Wire cutters
– Wire strippers
– Electrical tape
– Pipe dope
– Wire ties
– Make arrangements to have the meter calibrated after installation.










