Fire Pit User Manual
Initial Installation
QUALIFIED INSTALLERS ONLY
WARNING: 
Operation of this heater when not connected to a properly installed and maintained venting system can 
result in carbon monoxide (CO) poisoning and possible death.
PREPARATION FOR INSTALLATION:
• Remove the packaging from the appliance, and check to make sure there is no damage.  If damage is 
found, please report it to both the carrier and your dealer as soon as possible.
• Before beginning, carefully check the glass door and the log set
• Locate a position where the ue system of the stove can be properly installed without damaging the 
integrity of the building; e.g. cutting a wall or ceiling joist.
• Check stove and ue system clearance requirements.
• Locate the stove where it can be accessed by a gas supply line.
• Locate the stove in a large and open room that is centrally located in the house.  This will optimize heat 
circulation and comfort.
• As the stove can be equipped with a convection fan, ensure that an electrical outlet is within 6 ft (1.8 
m) of the stove.
• The ow of combustion and ventilation air must not be obstructed.
CLEARANCES TO COMBUSTIBLES:
A. Sidewall to unit  11 inches (27.9 cm)       
B. Backwall to unit  2.5 inches (6.35 cm)      
C. Corner to unit  2.5 inches (6.35 cm)      
D. Ceiling    60 inches above oor (152.4 cm)   
E. Floor    (hard wood and linoleum) 0 inches
Note:  When  installing  on  a  carpeted  surfaces  a  non- 
combustible hearth pad must be used.
Minimum Alcove Dimensions:
  Width    48 inches (121.9 cm)
  Height    60 inches (152.4 cm)
  Depth (max)  24 inches (60.96 cm)
CLEARANCES MUST BE SUFFICIENT TO ALLOW ACCESS FOR MAINTENANCE AND SERVICE.
PLANNING YOUR INSTALLATION:
When planning your installation, it will be necessary to select the proper length of vent pipe for your 
particular requirements. It is important to note when passing through a wall, the maximum allowable 
wall thickness is 10 inches (25.4 cm), 1 inches (3.8 cm) clearance to combustibles must be maintained. 
Select  the  amount  of  vertical  rise  desired  for  “vertical-to-horizontal”  type  installations.  To  determine 
the length of vent pipe required for vertical installations, measure the distance from the appliance ue 
outlet to the ceiling, the ceiling thickness, the vertical rise through the attic or second story, and allow 
for sufcient vent height above the roof line. For two story applications, a re stop is required at each 
oor level. If an offset is needed in the attic, additional pipe and elbows will be required. To connect the 
venting system to the appliance ue outlet, a twist-lock adapter is built into the appliance at the factory. 
Refer to INITIAL INSTALLATION - VENT CONFIGURATION AND RESTRICTOR SETTINGS for venting parameters.
 
 
 
 
Figure 14: Clearances to combustibles.