Specifications
8
Installation
ASSEMBLY
1. First install the hearth pad if you plan on using it. You
may have to unscrew feet to raise unit up. Tilt the unit
so it is balancing on the back feet, slide the hearth pad
under the unit while making sure the side mounting
tabs are on the outside of the base flange. once holes
are aligned secure with provided T-20 thread rolling
screws. See Figure 2.
2. Next install the Cabinet Sides. There are six screws
for mounting each cabinet side. Start by installing
screws at front top of the panels, Do not fully tighten
screws. Now get the back top screws started. Now
install the rest of the screws and tighten them down.
See Figure 3.
3. Now Install Ash Shelf and Louvers. Ash Shelf is
mounted using two T-20 thread roller screws. The
Louvers are installed by inserting into slots cut into
louver moutning brakets located above the door.
If properly aligned the louvers should catch on the
bracket tabs and sit at a 15 degree angle.
Figure 3: Cabinet Side Install
Figure 4: Louver and Ash Shelf Install
Figure 2: Hearth Pad Install