21 7, 5$ W\ 6 7 DQ *, DUU 5( Z < P 17 FR 5$ LUR $5 Y : HQ 0 ) 5 ( ( 6 7 $ 1 ' , 1 * 3 ( / / ( 7 6 7 2 9 ( 3/($6( 5($' 7+,6 (17,5( 0$18$/ %()25( ,167$//$7,21 $1' 86( 2) 7+,6 3(//(7 %851,1* 5220 +($7(5 )$,/85( 72 )2//2: 7+(6( ,16758&7,216 &28/' 5(68/7 ,1 3523(57< '$0$*( %2',/< ,1-85< 25 (9(1 '($7+ &217$&7 <285 %8,/',1* 25 ),5( 2)),&,$/6 $%287 5(675,&7,216 $1' ,167$//$7,21 ,163(&7,21 5(48,5(0(176 ,1 <285 $5($ ,167$//(5 /($9( 7+,6 0$18$/ :,7+ 7+( :22' 6729( &21680(5 5(7$,1 7+,6
Table of Contents Introduction...................................................................................................................3 Important Safety Data........................................................................................................3 Safety Warnings And Recommendations..............................................................................4 Rating Label Location......................................................................................................
Introduction IMPORTANT SAFETY DATA: Please read this entire Owner’s Manual before installing or operating your ENVIRO Pellet Stove. Failure to follow these instructions may result in property damage, bodily injury or even death. Any unauthorized modification of the appliance or use of replacement parts not recommended by the manufacturer is prohibited. Contact your local building or fire official to obtain a permit and any information on installation restrictions and inspection requirements for your area.
Introduction SAFETY WARNINGS AND RECOMMENDATIONS: Caution: Do not connect to any air distribution duct or system. Do not burn garbage or flammable fluids such as gasoline, naphtha or engine oil. Unit hot while in operation. Keep children, clothing and furniture away. Contact may cause skin burns. Warning: Parts of the appliance, especially the external surfaces, will be hot to touch when in operation and due care will need to be taken.
Introduction operation. If this power cord should become damaged, a replacement power cord must be purchased from the manufacturer or a qualified ENVIRO dealer. Be careful that the electrical cord is not trapped under the appliance and that it is clear of any hot surfaces or sharp edges. This unit’s maximum power requirement is 184 watts (600 watts peak). GLASS: Do not abuse the glass by striking or slamming the door. Do not attempt to operate the stove with broken glass. The stove uses ceramic glass.
Introduction RATING LABEL LOCATION: The rating label is located on the back of the ash pan access cover. PELLET QUALITY: Pellet quality is important, please read the following: Your Enviro pellet stove has been designed to burn wood pellets only. Do not use any other type of fuel, as this will void any warranties stated in this manual. The performance of your pellet stove is greatly affected by the type and quality of wood pellets being burned.
Installation DECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE: 1. Check the “Clearances to Combustibles” section for proper spacing. 2. Do not obtain combustion air from an attic, garage or any unventilated space. Combustion air may be obtained from a ventilated crawlspace. 3. Do not install the stove in a bedroom. 4.
Installation ASSEMBLY 1. First install the hearth pad if you plan on using it. You may have to unscrew feet to raise unit up. Tilt the unit so it is balancing on the back feet, slide the hearth pad under the unit while making sure the side mounting tabs are on the outside of the base flange. once holes are aligned secure with provided T-20 thread rolling screws. See Figure 2. Figure 2: Hearth Pad Install 2. Next install the Cabinet Sides. There are six screws for mounting each cabinet side.
Installation CLEARANCES TO COMBUSTIBLES: IMPORTANT: The P3 must have a Hearth Pad when installing the unit on a combustible floor. The included hearth pad meet all the requirement of a proper hearth pad. If you do not use the included hearth pad a non combustible material must be placed underneath the unit and extend six inches in front of the unit measured from the door.If the P3 is installed on carpet the use of a solid non combustible material must be used under leveling legs.
Installation VENT TERMINATION REQUIREMENTS: IT IS RECOMMENDED THAT YOUR PELLET STOVE BE INSTALLED BY AN AUTHORIZED DEALER/INSTALLER. Table 1: Use in conjunction with Figure 6 for allowable exterior vent termination locations. Letter Minimum Clearance Description A 24 in (61 cm) B 48 in (122 cm) Above grass, top of plants, wood, or any other combustible materials. Beside/below any door or window that may be opened. (18” (46 cm) if outside fresh air installed.
Installation OUTSIDE FRESH AIR CONNECTION: Outside fresh air is mandatory when installing this unit in airtight homes (R2000) and mobile homes. A Fresh-air intake is strongly recommended for all installations. Failure to install a fresh air intake may result in improper combustion as well as the unit smoking during power failures. When connecting to an outside fresh air source, do not use plastic or combustible pipe. A 2” minimum (51 mm) ID (inside diameter) steel, aluminum or copper pipe should be used.
Installation MOBILE HOME INSTALLATION: ● Secure the heater to the floor using the two holes in the pedestal. ● Ensure the unit is electrically grounded to the chassis of your home (permanently). ● Do not install in a room people sleep in. ● Outside fresh air is mandatory. Secure outside air connections directly to fresh air intake pipe and secure with three screws evenly spaced. CAUTION: THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL AND CEILING/ ROOF MUST BE MAINTAINED.
Installation HORIZONTAL EXHAUST THROUGH WALL INSTALLATION: Vent installation: install vent at clearances specified by the vent manufacturer. A chimney connector shall not pass through an attic or roof space, closet or similar concealed spaces, or a floor, or ceiling. Where passage through a wall or partition of combustible construction is desired, the installation shall conform to CAN/CSA-B365 Installation Code for Solid-Fuel-Burning Appliances and Equipment.
Installation 10. Install a vertical pipe, or if all requirements for direct venting are met, install vent termination. The stainless steel cap termination manufactured by the vent manufacturer is recommended. However, when the vent terminates several feet above ground level and there are no trees, plants, etc. within several feet, a 45° elbow can be used as termination. The elbow must be turned down to prevent rain from entering.
Installation INSIDE VERTICAL INSTALLATIONS: Rain Cap (ensure cap is at least 3ft above the roof at the lowest point) 2 ft (600 mm) Roof Flashing Roof Rafter Fire Stop with Support Collar Ceiling Joist 1. Choose a stove location that is ideal. See the section “DECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE.” 2. Place a non-combustible necessary. hearth pad where 3.
Installation HEARTH MOUNT INSTALLATION: Damper Removed or Fastened Open 10" (25.4 cm) Mantel Minimum 8" (20 cm) from top of stove Flue Connector Clean-out tee Min 6" (150 mm) Optional Hearth or Other Floor Protection Masonry Fireplace Combustible Floor Figure 18: Freestanding hearth mount installation.
Installation EXTERIOR MOUNTED EXHAUST BLOWER (20-070): The P3 can be equipped with an externally mounted exhaust blower. This optional kit includes all components necessary to install the exhaust blower on any vertical wall surface. Choose a location for your stove that meets the requirements stated in your manual and allows installation with the least amount of interference with house framing, plumbing, wiring, etc. Make sure unit is unpluged.
Installation THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - HORIZONTAL TERMINATION: 90° Elbow 45°Elbow with Rodent screen or stainless steel termination hood 2ft (610mm) Riser Pipe Adaptor Exterior Blower and Housing Electrical Cable Figure 23: Through Wall Installation with Exterior Blower Kit. NOTE: Ensure that all interior vent connections are sealed by placing a small bead of high temperature silicone around each chimney connection.
Installation TYPICAL THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - VERTICAL TERMINATION: Follow the previous pages for through wall installations. Ensure that vent pipe is properly secured to wall using wall straps. Maintain clearances to combustibles on vent pipe as well as unit. Roof Sheathing Rain Cap Roof Flashing Roof Rafters Ceiling Joists Vent Pipe Exterior Wall Sheathing Outside Vent Termination Figure 25: Through Wall Installation with Exterior Blower Kit; Vertical Termination.
Specifications DIMENSIONS AND SPECIFICATIONS: 15 1/2" (389 mm) Weight (with full hopper): 275 lb (125 Kg) Hopper Capacity: up to 62 lb (28 Kg) Voltage: 110 - 120 V Max Current: 4.1 Amps Consumption on High: 3.1 lb/hr (1.4 Kg/hr)* Consumption on Low: 1.3 lb/hr (0.6 Kg/hr)* (Note: Consumption will vary with the type of fuel used.) 5 1/2" (143 mm) 20" (508 mm) 18" (460 mm) 35" (886 mm) 17 1/2" (444 mm) 20 1/2" (526 mm) UNLESS OTHERWISE SPECIFIED 20 24" (615 mm) Sherwood Industries Ltd.
Operating Instructions CONTROL BOARD FUNCTIONS: 1. POWER BUTTON: This is the green button with the power symbol, it is used to turn the unit on and off. When the power is on and the blue LED beside the button will be illuminated. The LED will flash during the start-up cycle. Once startup cycle is complete the power LED will stay on. 2. AUTO BUTTON: Located below the Power button, when pressed this activates Auto or “Comfort” mode. LED beside button will be illuminated when active. 3.
Operating Instructions OPERATION YOUR PELLET STOVE: PRE-BURN INSTRUCTIONS: The burn pot liner holes must be clear and the liner installed properly against the ignitor tube for proper operation. Check the hopper for enough pellets to start the unit. DO NOT OPERATE THE UNIT WITH THE DOOR OR ASH PAN OPEN. TO START: Press the Power button. The stove will turn on. The LED beside the Power button will flash to indicate a start-up cycle.
Operating Instructions For less experienced installers or owners a magnehelic gauge can be used to determine the proper Damper setting. A magnehelic gauge will accurately measure the pressure in your firebox. There is a small hole on underneath the ash lip on the right side of the firebox front, see figure 31. You want a reading of .12-.15 WC (30-38 Pa) depending on pellet quality. The combustion exhaust blower is a variable speed blower controlled by the heat output button.
Routine Cleaning and Maintenance The following list of components should be inspected and maintained routinely to ensure that the appliance is operating at its’ optimum and giving you excellent heat value: 2-3 Days / Weekly Burn Pot and Liner Heat Exchanger Tubes Ash Pan Door Glass Inside Firebox Ash Pan and Door Gaskets Door Latch Semi-annually or 2 Tons of Fuel Exhaust Vent Air Intake Blower Mechanisms Heat Exchanger Tubes Behind Firebox Liners & Covers All Hinges Post Season Clean-up Burn Pot Liner Ig
Routine Cleaning and Maintenance DOOR GLASS CLEANING (2-3 days) Cleaning of the glass must only be done when stove is cold. Open the door. The glass can be cleaned by wiping down the outside and inside of the glass with a soft dry cloth. If the glass has build up that can not be removed with only the cloth, clean the glass using paper towel and a gas appliance glass cleaner, this may be purchased through most dealers.
Routine Cleaning and Maintenance • • • To remove and rotate the side covers to open them. Vacuum out all three 3 chambers. Close all the clean-out covers and tighten the screws. Scaper Rod HEAT EXCHANGER TUBES (2-3 days) • The heat exchanger tubes are located behind the Louver assembly. To access Heat Exchanger Scraper Rod, remove middle two louvers by tipping up and pulling out.
Routine Cleaning and Maintenance FIREBOX PANELS The paint on the steel firebox panels may peel. This is due to extreme conditions applied to the paint and is in no way covered by warranty. AIR WASH (semi-annually) Vacuum out the air wash passages at the top of the glass (see Figure 33). We recommend that a soft brush nozzle head is used on the vacuum. EXHAUST VENT (semi-annually) This vent should cleaned every year or after two tons of pellets. We recommend contacting your dealer for professional cleaning.
Troubleshooting DO NOT: ● Service the stove with wet hands. The stove is an electrical appliance, which may pose a shock hazard if handled improperly. Only qualified technicians should deal with possible internal electrical failures. ● Do not remove any screws from the firebox without penetrating oil lubrication. WHAT TO DO IF: 1. The stove will not start. 2. E2 on LED Display. 3. E3 on LED Display. 4. E4 on LED Display. 5. The Exhaust Blower will not function normally. 6. The Auger is not feeding pellets.
Troubleshooting 3. E3 on LED Display (Proof of Fire Failure) • If a fire is not detected, or if the fire has gone out the display will read E3 because the exhaust temperature is too low causing Exhaust Temperature Sensor’s contacts to open. • Check the hopper for fuel. Auger may need to be primed if stove has run out of pellet or being fired for the first time. • Incorrect air damper setting.
Troubleshooting 6. Auger is not Feeding Pellets. • If this is the first time starting the unit or during the previous burn the unit ran out of pellets the Auger will need to be primed. You may get an E3 while auger is filling with pellets, just press the power button again. Once the Auger is full of pellets it will start dropping them into the burn pot.
Wiring Diagram Supplied Armor Cable Grey Optional Exterior Exhaust Blower Black Ribbon Cable Vacuum Switch Grey White Combustion Blower White Blue Thermostat Connection Brown Exhaust Temperature Switch Power Cord Chassis Ground 115V Black 115V White Brown Red White 2A 2A 2A 2A 5A Ignitor Black (Hot) White (Common) Orange Orange Purple Blue Yellow Red Grey Grey Brown Purple White Yellow White Brown Convection Blower Auger Motor Orange Orange Magnetic Hopper Switch High Limit Switch
Parts List Ref.
Parts List Ref.
P3 - STEEL PARTS 34 30 40 46 31 38 37 20 21 36 34 17 18 42 45 35 32 24 28 41 23 44 29 39 43 19 33 25 Parts Diagram
Parts Diagram 13 15 16 12 2 5 7 14 22 4 8 10 3 11 1 9 6 P3 - COMPONENTS 35
J F M A M J J A S O N D 2014 2015 DATE OF MANUFACTURE / DATE DE FABRICATION: 2016 2017 2018 Pour l'usage avec les combustibles sous forme de boulets uniquement. Fonctionner seulement avec la vue de porte et la porte d'enlèvement de cendre ont fermé. Seulement remplacer le verre avec le verre de ceramique. Les composants ont exigé pour l'installation: 3 pouce (75 mm) ou 4 pouce (100 mm) a énuméré le conduit de PL complète avec les composants.
Installation Data Sheet The following information must be recorded by the installer for warranty purposes and future reference.
Notes 39
MANUFACTURED BY: SHERWOOD INDUSTRIES LTD. 6782 OLDFIELD RD. SAANICHTON, BC, CANADA V8M 2A3 40 www.enviro.