User manual
4
exactly like performing a fireworks display. In fact, further details can be found at the
ScriptMaker Visual User Manual.
9. At this stage, it is important to point out that the delay between one flame and the other is
calculated automatically. Thus, the software automatically calculates the difference between
the first flame (or set of flames) and the second flame (or set of flames) and assigns that
difference as being the duration of the first flame (or set of flames). The same procedure applies
to the subsequent flames.
10. However, if you want that a particular flame (or set of flames) has duration other than the
automatic difference calculated and explained earlier, one can easily input the duration in
seconds in the ‘Comment’ column of ScriptMaker Visual and the software supersedes the
automatic calculated duration by the specified amount.
11. Close ScriptMaker Visual and open the file created in CueMaker Visual. Convert and save the .scr
file created in ScriptMaker Visual to .fir file. There is no need of any particular preference in the
assignment options. The important thing is that the final result is a .fir file.