User's Manual

Table Of Contents
CE870 Card Personalization System Installation and User Guide 13
Chapter 2: Installation
Requirements
This chapter describes the PC requirements, site requirements, and
electrical requirements for the equipment.
Your company may have additional requirements for a card
production environment. Talk to your system administrator to
determine the optimum location for card production.
This section describes:
PC Requirements
Site Requirements
Electrical Requirements
PC Requirements
The following network components are required:
An Ethernet network that uses the TCP/IP protocol and can run at 100
megabits per second, also called 100base-T.
An Ethernet cable to connect the system to the network. No Ethernet cable is
supplied with the system.
A PC that meets the requirements listed above and is connected to and
communicating with the network.