User's Manual Part 2
T
ECHNICAL
D
OCUMENTATION
P
ROTECTING
P
EOPLE AND
A
SSETS
®
D
ATE
:
22
M
ARCH
2017
|
V
ERSION
:
1.4
67
R
ANGER
-X5
R
ADAR
S
YSTEM
T
ROUBLESHOOTING
,
M
AINTENANCE
,
AND
C
ALIBRATION
EEC
®
|
C
OMPANY
P
ROPRIETARY
4. System Troubleshooting
4.1. Control Cabinet
4.1.1. Power
1. Verify that the main power input cable is connected, and is receiving the proper voltage
from your power source.
2. Verify that the “main” power breaker is in the on position (in the closed position) and the
associated LED is illuminated.
3. Verify that the UPS is powered on.
NOTE: On initial power up the UPS LCD will display data, but may actually be in standby
mode. Ensure that the UPS is actually in an operational mode. To change the UPS from
standby mode to “ON” or an operational state, the power button on the face of the UPS
will need to be pressed and held until it powers on, at which time it can be released.
4. Verify that the power distribution unit is on, and has completed its warm up cycle (this
may take a few minutes on initial power up).
If all of the afore mentioned conditions have been met, you should be able to power on the IQ2,
EDGE, and Cobra “machines” using their respective power buttons. If these conditions have been
met and you are still unable to power on the cabinet or computers, please contact EEC’s
customer service department.
4.2. Pedestal System
4.2.1. Azimuth Rotation
1. Verify that servo power is enabled in the EDGE software.
2. Ensure that the pedestal power breaker is in the on (closed) position, and the respective
LED is illuminated.
3.
Verify that both emergency stop switches are disengaged.
NOTE: If either emergency stop switch is engaged, the reset button (located on the front of the
cabinet) must be pressed and held for 2 to 3 seconds, then released after the emergency stop
switch has been disengaged.
4. Ensure that all connections between the cabinet, box, and pedestal are attached firmly.
5. Using a voltmeter or multimeter, carefully verify that the +48 VDC power supply (located
inside the cabinet) is generating the proper voltage.
6. Reset the EDGE software via the terminal, and restart the IQ2 computer.
7. Contact EEC Customer Service Department.
4.2.2. Elevation Rotation
See Paragraph 4.2.1.
and
1. Verify the +48 VDC power is passing through the slip-ring by measuring the voltage either
inside the “T-Cross” on the elevation Elmo power input, or on the respective terminal block
inside the payload support assembly.
2. Verify the +24 VDC power is passing through the slip-ring by measuring the voltage either
inside the “T-Cross” on the elevation Aquarian controller PCA power input, or on the
respective terminal block inside the payload support assembly.
3. Verify that the power indication LEDs on the Aquarian are illuminated.
4. Verify the Ethernet hub inside the payload support has connectivity through the slip-ring
(this can be achieved by “pinging” the UST from your workstation).