Installation guide
Connecting to the Network
3-20 Hardware Installation
Figure 3-12 Connecting a UTP Cable Segment to RJ45 Port
3. VerifythatalinkexistsbycheckingthattheLink/Act ivityLEDisON(solidgreenor
blinkinggreen).
4. IftheLink/ActivityLEDisOFF,performthefollowingstepsuntilitison:
a. VerifythatthecablingbeingusedisCategory 5orbetterwithanimpedance
between85and111 ohmswitha
maximumlengthof100meters(328feet).
b. Verifythatthedeviceattheotherendofthetwistedpairsegmentisonand
properlyconnectedtothesegment.
c. VerifythattheRJ45connectorsonthetwistedpairsegmenthavetheproper
pinoutsandcheckthecableforcontinuity.Typically ,acrossover
cableisused
betweenhubdevicesbutthisisnotnecessary.Astraight‐throughcablecanbe
usedtoconnectbetweentheswitchandanydevice.RefertoFigure 3‐13and
Figure 3‐14forfour‐wireRJ45connections.RefertoFigure 3 ‐15andFigure 3‐16
foreight‐wireRJ45connections.
d. Ensure
thatthetwistedpairconnectionmeetsthedBlossandcablespecifications
outlinedintheCablingGuide.Referto“RelatedDocuments”onpage xvifor
informationonobtainingthisdocument.
5. Ifalinkisnotestablished,contactEnterasys Networks.Referto“GettingHelp”on
page 1‐7fordetails.
Repeatallsteps
aboveuntilallconnectionshavebeenmade.
1 RJ45 connector 2 Port 8 3 Port 8 Link/Activity LED
Note: If the cable is connected to one of the PoE RJ45 front panel ports, solid green or
blinking green also indicates that PoE power is available. If the LED is solid amber or
blinking amber PoE power failed. For more details, refer to Chapter 4.
1
2
1
1
12
135791
1
1
3
1
517192123
24681012 14 1
6
18 20 2
224
1234567891011
1
2
À
Á
Â