Installation guide
Connecting to the Network
3-16 Installation
Figure 3-8 Installing Module into Matrix N3 or N1 Chassis
Connecting to the Network
Thissectiondescribeshowtomonitorandverifytheportconnectionandactivityof
segmentsconnectedtoMini‐GBICsinstalledinthe7G4280‐19front‐panelandthe
7G‐6MGBIC/7G‐6MGBIC‐Afront‐panel.
Thefrontpanelports1through18andthe6portsofthe7G‐6MGBIC/7G‐6MGBIC‐A
supportallMini‐GBICsavailablefromEnterasysNetworks.Exceptfortheprocedureto
verifytheportstatusafterconnectingcables,theinstallationprocedurefortheRJ45
coppercableconnectionandfiber‐opticconnectiondescribedinthefollowingsectionsare
similar.
1 Card guides 5 Upper locking tab (shown in closed position)
2 Slot 1. The top slot is slot 3. 6 Lower locking tab (shown in closed position)
3 Module card 7 FTM2 and power backplane connectors
4 Metal back panel
FAN
STATUS
7C203-1
REDUNDANCY
PWR
100-125V~12.0A
200-240V~6.0A
50/60 Hz
0
7C203-1
REDUNDANCY
PWR
100-125V~12.0A
200-240V~6.0A
50/60 Hz
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
G
R
O
U
P
1
G
R
O
U
P
2
G
R
O
U
P
3
OFFLINE/
RESET
COM
CPU
MGMT
GROUP
SELECT
GROUP
33
1
2
4
5
6
1
2
DFE
7G4280-19
Gb ENET
Á
Æ
Ä
Â
ÀÃ
Å
Note: If the DFE module is being installed in a network using Link Aggregation, there are
rules concerning the network cable and port configurations that must be followed for Link
Aggregation to operate properly. Before connecting the cables, refer to the Matrix
DFE-Platinum Series Configuration Guide for the configuration information. For details on
how to obtain manuals, refer to “Related Documents” on page xv.