Installation guide
Connecting to the Network
Matrix DFE-Diamond Series Installation Guide 3-19
Figure 3-14 Cable Connection to LC Fiber-Optic Connectors
3. VerifythatalinkexistsbycheckingthattheportRXLEDison(flashingamber,blinking
green,orsolidgreen).IftheRXLEDisoff,performthefollowingstepsuntilitison:
a. VerifythatthedeviceattheotherendofthesegmentisONandconnectedto
thesegment.
b. Ifthereareseparatefiber‐opticconnectionsontheotherdevice,checkthecrossoverofthe
cables.Swapthecableconnectionsifnecessary.
c. Checkthatthefiber‐opticconnectionmeetsthedBlossandcablespecificationsoutlined
intheCablingGuideformultimodefiber‐opticcabling.Toobtainthis
document,referto
“RelatedDocuments”inAboutThisGuide.
Ifalinkhasnotbeenestablished,refertoChapter 4forLEDtroubleshootingdetails.Ifa
problempersists,referto“GettingHelp”onpage xvfordetailsoncontacting
Enterasys Networksforsupport.
4. Repeatsteps1through3,above,untilallconnections
havebeenmade.
1 Installed Mini-GBIC LC connector 4 Receive LED (RX)
2 LC cable connector 5 Transmit LED (TX)
3 Release tab
7GR4270-12
7GR4270-12