Installation guide

Unpacking the Power Supply Modules
Matrix N5 PoE Chassis (7C105-P) Installation Guide 3-5
Unpacking the Power Supply Modules
The7C2051andoptionalNPOE1200Wpowe rsupplymodulesareshippedinboxes
separatefromthechassis.Tounpackapowersupply,proceedasfollows:
1. Unpackthepowersupplybyremovingitfromtheshippingboxandslidingthetwo
foamendcapsofftheunit.(Savetheshipping
boxandmaterialsintheeventtheunit
mustbereshipped.)
2. VerifythecontentsoftheboxusingTable 32andTable 33,as appropriate.
3. Removethepowersupplyfromitsprotectiveplasticbag.
4. Examinethepowersupplycarefully,checkingfordamage.Ifanydamageisnoted,
DONOTinstallthe
powersupply.ContactEnterasys Networksimmediately.Referto
GettingHelponpage 110 fordetails.
Table 3-2 Contents of 7C205-1 Power Supply Carton
Item Quantity
7C205-1 AC Power Supply 1
Type of power cord is dependent on country of installation.
1
For USA shipments: NEMA Power Cord 6-20, C19, R/A, SHLD
1. If a power cord needs to be replaced, it must meet the requirements specified in “AC Power Cord
on page A-5
.
1
NOTICE Card 1
Table 3-3 Contents of Optional N-POE PSM Power Supply Carton
Item Quantity
N-POE-1200W DC Power Supply Module 1
Type of power cord is dependent on country of installation.
1
For USA shipments: NEMA Power Cord 6-20, C19, R/A, SHLD
1. If a power cord needs to be replaced, it must meet the requirements specified in “AC Power Cord
on page A-5
.
1
NOTICE Card 1