Installation guide

Connecting to the Network
Hardware Installation 3-27
2. Refer to Figure 3-18 and insert one end of the SC cable connector , key side down , into the
GPIM-01, GPIM-08, or GPIM-09
. Ensure that the appropriate cable is used for the
application of the GBIC. Refer to Appendix C for the appropriate GBIC and fiber optic cable to
be used in the installation.
Figure 3-18 Fiber GBIC Connections
3. At the other end of the fiber optic cable, attach the SC connector to the other device. Verify that
a link exists by checking that the Link LED
is ON (solid green). Refer to Chapter 4 for details
on the LEDs. If the Link LED is OFF and the RX/TX LED is not blinking amber, perform
the following steps until it is ON:
a. Check that the device at the other end of the link has power turned on and is Gigabit Ethernet
compatible.
b. Verify proper crossover of fiber strands between the port on the device and the fiber optic
device at the other end of the fiber optic link segment.
c. Verify that the fiber optic cable meets the specifications outlined in Appendix C for the
installed GBIC.
SC Cable Connector
Link LED
Latch Keys (bottom of SC connector)
Receive/Transmit (RX/TX) LED
GPIM-01, GPIM-08, or GPIM-09
36802_20
À
Á
Â
1G-2GBIC
Ä
Ã