User manual

Connecting to the Network
3-30 Hardware Installation
3. VerifythatalinkexistsbycheckingthattheLink/ActivityLEDisON(solidgreenor
blinkinggreen).IftheLink/ActivityLEDisOFF,performthefollowingstepsuntilitis
on:
a. VerifythatthecablingbeingusedisCategory5orbetterwithanimpedance
between85and111ohms
withamaximumlengthof100meters(328feet).
b. Verifythatthedeviceattheotherendofthetwistedpairsegmentisonand
properlyconnectedtothesegment.
c. VerifythattheRJ45connectorsonthetwistedpairsegmenthavetheproper
pinoutsandcheckthecableforcontinuity.Typically,
acrossovercableisused
betweenhubdevices.Astraightthroughcableisusedtoconnectbetween
switchesorhubdevicesandanenduser(computer).RefertoFigure317and
Figure318forfourwireRJ45connections.RefertoFigure319andFigure 320
foreight
wireRJ45connections.
d. EnsurethatthetwistedpairconnectionmeetsthedBlossandcablespecifications
outlinedintheCablingGuide.RefertoRelatedDocumentsonpagexivfor
informationonobtainingthisdocument.
4. Ifalinkisnotestablished,contactEnterasysNetworks.RefertoGettingHelpon
page
16fordetails.
Repeatallstepsaboveuntilallconnectionshavebeenmade.