Specifications

Enterasys Xpedition 8000/8600 Getting Started Guide 53
Installing the Hardware
The following table lists the environmental specifications for the XPs AC power supplies.
Figure 25 shows an example of how to install an AC power supply. The procedure
following the figure describes how to do this.
Figure 25. Installing an AC power supply
AC Power Supply Installation Procedure
To install an AC power supply:
1. Ensure that the AC power supply is not powered on.
2. If a cover plate is installed over the power supply slot, use the #2 Phillips screwdriver
to remove it. If you are replacing an AC power supply, unplug the power cable from
the supply you are replacing, loosen the captive screws on the power supplys front
panel, then pull the supply out of the chassis.
Operating Temperature +5 to +40 °C (41 to 104 °F)
Non-operating
temperature
-30 to +73 °C (-22 to 164 °F)
Operating Humidity 15 to 90% (non-condensing)
SSR-8
G80-PAC
100-125~5A
200-240~3A
50-60 Hz
PWR