Datasheet

Completing the Installation
3-30 Installation
Completing the Installation
Completing the DFE-Platinum module installation depends on if the module is being
installed in:
a new DFE-Platinum module system (refer to “Completing the Installation” on
page 3-30), or
an established, operating DFE-Platinum module system (refer to “Completing the
Installation of a DFE-Platinum Module in an Existing System” on page 3-32).
Completing the Installation of a New System
In a new system of DFE-Platinum modules, one of the installed DFE-Platinum modules
will become the management module on chassis power up, and all DFE-Platinum
modules will automatically be set to the factory default values. A complete list of the
factory default values are provided in Chapter 3 of the Matrix DFE-Platinum Series
Configuration Guide.
Modem Port Adapter Wiring and Signal Diagram
RJ45 DB25
Pin Conductor Pin Signal
1 Blue 2 Transmit (TX)
2 Orange 8 Data Carrier Detect (DCD)
4 Red 3 Receive
5 Green 7 Ground (GRD)
6 Yellow 20 Data Terminal Ready (DTR)
8 Gray 22 Ring Indicator
RJ45 Connector (Female)
81
Pins
DB25 Connector (Male)
131
Pins
14 25