Datasheet

Unpacking the DFE-Platinum Module
3-2 Installation
Unpacking the DFE-Platinum Module
Unpack the DFE-Platinum module as follows:
1. Open the box and remove the packing material protecting the DFE-Platinum module.
2. Verify the contents of the carton as listed in Table 3-2.
3. Remove the tape seal on the non-conductive bag to remove the DFE-Platinum
module.
4. Perform a visual inspection of the DFE-Platinum module for any signs of physical
damage. Contact Enterasys Networks if there are any signs of damage. Refer to
“Getting Help” on page 1-6 for details.
Installing Optional Ethernet Interface Module
At the time of this printing, only the 7G-6MGBIC is available for the 7H4382-25. Refer to
your release notes for the latest available Ethernet interface modules. The 7G-6MGBIC
provides six Gigabit port slots for optional Mini-GBIC connections.
Installing a 7G-6MGBIC involves
removing the coverplate from the DFE-Platinum module (7H4382-25),
attaching the 7G-6MGBIC to the DFE-Platinum module, and
installing the Mini-GBICs.
Table 3-2 Contents of DFE-Platinum Module Carton
Item Quantity
DFE-Platinum module (7H4382-25) 1
Installation Guide 1
Customer Release Notes 1
Note: Install any optional equipment before proceeding to the section, “Backplane
Connections and Installation Rules,” on page 3-8 for an explanation of the rules to install
different series modules in a Matrix E7 chassis.
Caution: An antistatic wrist strap is required to perform the following procedures to
minimize ESD damage to the devices involved.