- Enterasys Gigabit and Fast Ethernet Switches Hardware Installation Guide

Table Of Contents
Connecting to the Network
SecureStack B2 Installation Guide 3-23
2. ConnectthetwistedpairsegmenttotheswitchbyinsertingtheRJ45connectoronthe
twistedpairsegmentintothedesiredRJ45port(forexample,Port8).
Figure 3-13 Connecting a UTP Cable Segment to RJ45 Port
3. Ve rifytha talinkexistsby checkingthattheLink/ActivityLEDisON(solidgreenor
blinkinggreen).IftheLink/Act ivityLEDis
OFF,performthefollowingstepsuntilitis
on:
a. Ve rifytha tthecablingbeingusedisCategory 5orbetterwithanimpedance
between85and111 ohmswithamaximumlengthof100meters(328feet).
b. Verifythatthe deviceattheotherendofthetwistedpairsegmentisonand
properlyconnectedtothesegment.
c. VerifythattheRJ45connectorsonthetwistedpairsegmenthavetheproper
pinoutsandcheckthecableforcontinuity.Typically ,acrossovercableisused
betweenhubdevices.Astraightthroughcableisusedtoconnectbetween
switchesorhubdevicesandanenduser
(computer).RefertoFigure 314and
Figure 315forfourwireRJ45connections.RefertoFigure 316andFigure 317
foreightwireRJ45connections.
d. EnsurethatthetwistedpairconnectionmeetsthedBlossandcablespecifications
outlinedintheCablingGuide.RefertoRelatedDocumentsonpage xvifor
informationonobtainingthis document.
4. Ifalinkisnotestablished,contactEnterasys Networks.RefertoGettingHelpon
page 18fordetails.
Repeatallstepsaboveuntilallconnectionshavebeenmade.
1 RJ45 connector 3 Port 8 Link/Activity LED
2 Port 8
1
2
1 2 3 4 5 6 7 8 9 10 11 12
11
12
Â
À
Á