- Enterasys Gigabit and Fast Ethernet Switches Hardware Installation Guide
Table Of Contents
- Enterasys® SecureStack™ B2 Gigabit and Fast Ethernet Switches Hardware Installation Guide
- Notice
- Regulatory Compliance Information
- Federal Communications Commission (FCC) Notice
- Clase A. Aviso de ITE
- Klasse A ITE Anmerkung
- Seguridad del Producto
- Produktsicherheit
- Electromagnetic Compatibility (EMC)
- Compatibilidad Electromágnetica (EMC)
- Elektro- magnetische Kompatibilität ( EMC )
- VCCI Notice
- BSMI EMC Statement - Taiwan
- Safety Information Class 1 Laser Transceivers
- Enterasys Networks, Inc. Firmware License Agreement
- Regulatory Compliance Information
- Notice
- Contents
- About This Guide
- Introduction
- Network Requirements
- Hardware Installation
- Considerations Prior to Installation
- Required Tools
- Unpacking the Switch
- Installing Optional Mini-GBICs
- Installing the Switch on a Flat Surface
- Rack Mounting the Switch
- Connecting High-Speed Stacking Cables
- Configuring Switches in a Stack
- Connecting AC and RPS-SYS Power
- Connecting to Console Port for Local Management
- Connecting to the Network
- Completing the Installation
- Troubleshooting
- Specifications
- Index

Configuring Switches in a Stack
3-14 Hardware Installation
Recommended Procedures for New and Existing Stacks
Installing a New Stackable System of Up to Eight Switches
Usethefollowingproceduretoinstallanewstackofuptoeightswitchesoutofthebox.
Beforeapplyingpower,makeallphysicalconnectionswiththestackcablesasdescribed
in“ConnectingHigh‐SpeedStackingCables”onpage 3‐10 .
1. Onceallofthestackcableshavebeenconnected,individually
poweroneachswitch
fromtoptobottom(connectingpowertoaswitchisdescribedin“ConnectingACand
RPS‐SYSPower”onpage 3‐15).
Iftheswitchesarepoweredonalmostsimultaneously,thesys temwillautomatically
selectthefirstonethatpowersupastheMasterswitchand
theothersasMember
switches.TheswitchesareassignedunitIDsintheorderthattheybecomefully
operational.
YoucancontroltheunitIDassignmentaccordingtothephysicalpositioninastack.
Whenyoupowerupeachswitchandallowittobecomefullyoperationalbefore
applyingpowerto
thenextswitch,thefirstonebecomestheManagerandallthenext
switcheswilljointhatstack(regardlessofPriority,FirmwareRevision,orMAC
Address).TheswitchesareassignedunitIDsintheorderthatyoupoweroneach
switch.
2. (Optional)Ifdesired,changethemanagementswitchusingtheset
switch
movemanagementcommandasdescribedintheSecureStackB2ConfigurationGuide.
3. Oncethedesiredmasterswitchhasbeenselected,resetthesystemusingthereset
commandasdescribedintheSecureStackB2ConfigurationGuide.
Important
The following procedures assume that all switches have a clean configuration from manufacturing.
When adding a new switch to an already running stack, it is also assumed that the new switch is
using the same firmware image version as other switches in the stack.
Note: Once switch IDs are assigned, they are persistent and will be retained during a
power cycle to any or all of the switches.