- Enterasys Standalone Switch Installation Guide

Connecting Power
3-4 Installation
Connecting Power
Toconnectthemoduletothepowersources,refertoFigure 33andproceedasfollows.
Toconnectthemoduletothepowersources,refertoFigure 33andproceedasfollows:
1. PlugapowercordintoeachswitchACpowerreceptacle.Totakeadvantageof
redundancycapabilities,plugeachpower
cordintoaseparatededicatedACoutlet.
2. PlugthecordintoadedicatedgroundedACoutletasshowninFigure 33.
Figure 3-3 Connecting Power
3. ObservetheLANVIEWLEDs.ThePower(PWR)LED(notshown),locatedonthe
frontpanel,turnsON(green)andtheCPUturnsreduntilthemodulecompletesits
initialization.
Ittakesunder30secondsforthemoduletobootup.
Iftheinitializationprocessissuccessful,theCPULEDturnsgreen.IftheCPULEDdoes
notturngreen,refertoChapter 4fortroubleshootinginformation.
Note: The two power supplies in the module have automatic voltage sensing that allows
connection to power sources ranging from 100–125 Vac, 2.5 A or 200–240 Vac, 1.25 A,
50/60 Hz.
1 AC power cords 2 AC power outlets 3 AC power receptacles
Note: If the power-up sequence is interrupted on this device, or if optional hardware has
been installed or removed, this device may run an extended diagnostics sequence that
may take up to two minutes to complete.
AC INLET 1
100 - 125V ~ 3.6A
200 - 240V ~ 1.6A
50/60 Hz
AC INLET 2
100 - 125V ~ 1.8A
200 - 240V ~ 0.8A
50/60 Hz
Á Á
À ÀÂ Â