Datasheet

44
Ensto has a number of modern and
efficient production plants in Finland,
mainly for production of enclosures.
The Porvoo works, approx.17.000 m
2
,
produces small and middle-sized
enclosures. The Salo works, over
13 000 m
2
makes large enclosures,
and part of the middle-sized types
as well. Metal enclosures and metal
accessories are made at the Mikkeli
plant, over 8 000 m
2
. The plants in
Sweden and Norway are assigned
to plastic and other accessories.
Production capacity
Ensto has a versatile machinery, over
150 injection moulding machines,
fitted with robots to secure maximal
output. The individual machines vary
from 20 tons to 1 300 tons. The Ensto
group also includes several units spe-
cialized in process automatization.
Injection moulds are produced within
the group.
Subcontractor services
Utilization of the newest technology
available is significant for Ensto. This
feature has made Ensto one of the
largest subcontractors in Europe in
fields of electromechanical and elec-
tronic equipment and accessories in
plastics and metal.
Testing
Through the years Ensto has pre-
served a very high quality profile, a
guarantee for which is the ISO
14000 quality system applied. The
Ensto at top of technology