Installation Manual
7
QUICK INSTALL GUIDE
Do not use shipping caps to cover
unused connectors. The shipping cap
does not provide an adequate
environmental seal.
Terminate the Unused End of the Cable
a. Remove 60 mm (2.5”) of the cable sheath from
the conductors.
b. Check that all terminator parts are present.
c. Slide the hex nut onto the cable.
d. Insert the cable end all the way into the wire
organizer (up to the stop).
e. Attach the cap.
f. Attach the terminated cable end to the
PV racking with a cable clip or tie wrap.
hex
nut
wire
organizer
cap
Connect the Microinverters
a. Remove and discard the temporary shipping cap
from the cable connector and connect the
microinverter. Listen for two clicks as the
connectors engage.
b. Cover any unused connectors with Enphase
Sealing Caps. Listen for two clicks as the connec-
tors engage. See notes in Step Details.
c. Attach the terminated cable end to the PV
racking with a cable clip or tie wrap.
WARNING: Install sealing caps on all
unused AC connectors as these become
live when the system is energized by the
utility. The IP67-rated sealing caps are
required for protection against moisture
ingress.
6
bend wires down
into recesses of
wire organizer and
trim to length
place cap over
the wire orga-
nizer
hold the cap
with the dis-
connect tool or
a #2
screwdriver
rotate the hex nut
with your hand or
a wrench until the
latching
mechanism meets
the base–
do not over torque
Never unscrew the hex nut. This action
can twist and damage the cable.