IQ Load Controller Additional Info

Load and Solar Circuit Control using IQ System Controller Auxiliary Contacts
11 © 2021 Enphase Energy Inc. All rights reserved. December 16, 2021
Figure 8: Battery Mode: Load control based on ESS State of Charge (SoC) via Enphase Installer App
1. Select ‘Advanced’
2. Select ‘Battery’ as the ‘Off Grid power Source’
3. Select the required SoC limit using the sliding range selector
4. Select the Buffer value.
5. Check ‘Homeowner can override’ – this will let the homeowner to access the settings from
Enphase App Homeowner App
6. Press ‘Save’
Advanced mode with Generator based control: Shed load when off-grid and restore when
generator is connected
Note: Generator Mode available for systems with a standby generator. Generator support being released
soon for Enphase Storage system.
IQ System Controller auxiliary contacts will shed the specific load circuits as soon as the system enters
the off-grid mode and then reconnects specific load circuits to the microgrid after the generator is
connected to the microgrid.