Technical data
Table Of Contents
- Important Information
- The Enphase Envoy Communications Gateway
- Installation Planning and Preparation
- Install the Envoy
- 1. Find the Envoy Serial Number
- /2. Register the Envoy
- 3. Find a Location for the Envoy
- 4. Connect to the Internet
- 5. Check the Internet Connection
- 6. Install the Modules and Microinverters
- 7. Check the Envoy’s Progress
- 8. Wall Mount the Envoy (Optional)
- 9. Build the Virtual Array
- 10. View System Performance in Enlighten
- Envoy Operation
- Troubleshooting
- Power Line Communication Troubleshooting
- Network Basics and Troubleshooting
- Issue: IP Address Problems
- Issue: LCD Screen Displays “-Web”
- Issue: LCD Screen Displays “Envoy Failure +Web or -Web”
- Issue: LCD Screen Displays "Scanning Inhibited"
- Issue: The Envoy has Good Signal Strength but is Too Far from the Router
- Issue: Wireless Adapter Wi-Fi Problems
- Issue: How Set Up Wi-Fi Without Wi-Fi WPS
- Issue: Internet Traffic is Slower After Installing a Bridge
- DHCP versus Static IP Addressing
- MAC Filtering
- Firewall Settings
- Replacing an Envoy
- Envoy Local Interface
- Technical Data
Envoy Installation and Operation
2014 Enphase Energy Inc. 141-00011 Rev 05
41
Set or Change the Grid Profile
Many Enphase Microinverters have field-adjustable voltage and frequency trip points. Trip points are input
voltage or frequency values that trigger the microinverters to shut down when the values are exceeded. If local
regulations require adjustments to these trip points, or if the grid profile was not set up during registration
(see page 11), the installer can set up the system to use an alternate Grid Profile (set of trip points).
NOTE: Only an authorized installer, following the requirements of the local electrical utility, is
allowed to make Grid Profile adjustments.
NOTE: Grid profile changes are applied only after a microinverter is detected.
In some regions and in some situations, microinverter trip points may be adjusted to account for high grid voltage
or for local conditions.
Grid profile management tasks include:
Set the grid profile for your region
View or verify current trip point settings
Generate a report for confirmation of site settings to the utility or other authority
This feature is protected through use of a Change Token. Change tokens are issued on a per Envoy serial
number basis. This procedure includes instructions on how to get a Change Token. If needed, contact
support@enphaseenergy.com for your Grid Profile Change Token as directed on the screen. Change tokens
expire after a day, so later grid profile changes may require a new token.
1. From the System Overview screen, click on Inventory and verify that all installed microinverters
are detected.
2. Click Administration to access the Administration menu.
The default log in credentials for the Administration menu are:
Username: admin
Password: admin
The System Administration screen appears.