Technical data
Envoy Installation and Operation
Copyright 2012 Enphase Energy 141-00011 Rev 03
17
Performing a Communication Check
If, when you are installing the Envoy, you are unsure of where it should be located for maximum
performance, you may want to install the Envoy in various locations and check signal strength.
Normally, a communication check starts automatically after an Envoy restart. Alternatively, you can
initiate a communication check with the Envoy Menu button, or through the administration page
when connected to the Envoy local interface with a computer, or via Enlighten (Refer to “Using
Enlighten to Check Envoy Status” on page 23).
NOTE: If a Priority Scan is active, the Communication Check will not occur until the
Priority Scan has expired. If you need to run a Communication Check, you can unplug
the Envoy and then plug it in again or wait until priority scanning has ended during
which time the signal bars will return.
NOTE: Device scans and communication checks can only be done during daylight
hours when the microinverters are powered by the PV modules.
To use the Envoy Menu button to initiate a communication check:
1. Press and hold the Menu button on the right side of the Envoy to bring up the Envoy
menu on the LCD screen.
2. When the LCD screen displays “Enable Communication Check”, release the Menu
button.
The LCD screen then reads:
The Envoy begins a 20-minute communication check to assess the signal strength
between the Envoy and the microinverters detected at the site. Until the Envoy begins
detecting microinverters, the display reads:
When the Envoy begins detecting microinverters, the display reads:
[≡≡≡ ] mm:ss +Web
Level Devices: n
Comm Check +Web
Searching...
Comm check enabled
for 20min
Enable
Communication Check










