Technical data

Envoy Installation and Operation
Copyright 2012 Enphase Energy 141-00011 Rev 03
11
e. Assess the power line communications. To do this:
Wait until the Priority New Device Scan is complete (The message Priority Scan is
Active will no longer be shown on the LCD).
Press and hold the Envoy menu button. Release it when the LCD window displays
Enable Communication Check. The check will run for 20 minutes.
Note the number of bars shown in the Communication Check. If fewer than three
bars are shown, seePower Line Communication Troubleshooting on page 24.
f. Refer to LCD Screen Displays on page 13 for more information.
7. Wall Mount the Envoy (Optional)
NOTE: Before mounting the Envoy, it is best to perform a Communication Check as
described on page
17 to optimize the location of your Envoy.
After you have positioned your Envoy for optimal communications and it is has begun to detect
devices, you can mount the Envoy on a wall. To do this:
a. Select a cool, dry, indoor location for the Envoy.
b. Use two drywall screws or wall anchors (not included) to affix the Envoy to the wall,
mounted at the dimensions shown. You will need two #8 (4.17 mm or 0.16 in.
diameter); maximum screw head diameter is 8.9mm (0.35 in.).
c. Slide the Envoy onto the mounting screws, aligning the Envoy screw holes with the
screws installed in step b.