User Manual
Planning for a Three-Phase IQ Microinverter System – North America
© 2017 Enphase Energy Inc. All rights reserved. September 20, 2017
17
Q Cable and raw Q Cable must be supported at intervals not to exceed 6 feet, ensuring the cable does not
touch the roof surface.
Manufacturer
Model
Image
Nine Fasteners
DCS-1307 PV cable clip
DCS-1306 USE-2 cable clip
Burndy / Wiley Electronics
ACME ACC-PV PV cable clip
Heyco Products
SunRunner PV cable clip
Supporting the DC Module Leads
Prepare the modules using clips on the DC module leads to prevent the leads from resting on the roof. It is
best to prepare the modules on the ground before installation. Install the wire clips and DC module leads to
allow for easy connection to the microinverter while also supporting the conductors off the roof.
Once the modules are prepared, install them on the racking. Secure any loose wires or cables to the module
frames with properly sized wire clips. Ensure that all conductors are supported off the roof.